A structured innovation pipeline
The challenge-mapping process is structured in three stages and contemplates five possible directions. This structured, continuous pipeline ensures critical analysis and fosters innovative solutions with potential for practical application in MRN operations throughout the year.
Prioritised items may either follow the open-innovation pillar, through the execution of Proofs of Concept (PoC), or be directed to the R&D&I pillar, depending on the level of complexity and the testing and implementation timelines.
Grouped
when they present relevant intersections
Standby
when they are not prioritised at the moment
Continuous improvement
when they can be developed with internal resources
Cancelled
when they are no longer considered relevant
Prioritised
when they prove strategic and relevant for the period
Technology tested in operations
In 2025, there were 18 PoCs in the innovation portfolio. Among them, the 2025 Sustainability Report highlights the projects below.
POCs COMPLETED IN 2025
Alternative energy matrix diesel oil — Locomotive
This project aimed to reduce fuel consumption in the MRN locomotive through the implementation of a fuel catalyst called Rentar. It is a physical device that reorganises the fuel at the molecular level before combustion. Its use increases energy efficiency, reduces emissions and saves fuel, with no moving parts or electrical components. A comparison between equivalent periods of the year, considering scenarios with and without the equipment, indicated fuel savings of between 2% and 3%.
Particulate control on mine access roads
This project aimed to reduce the cost of controlling particulate matter on mine access roads, as well as increasing their resistance and reducing pothole formation through the application of a specific product. Three months after application, the test area showed no potholes or pavement deformation. After five months, while adjacent stretches underwent maintenance, the treated lane remained in adequate condition.
POCs IN IMPLEMENTATION IN 2025
Fuel reduction in idle equipment (Ion Drive)
This project aims to reduce diesel consumption in the MRN fleet, specifically in mine equipment during idle. The initiative acts directly on periods of operational inactivity, such as waiting in loading, unloading and fuelling queues. A critical differentiator of this PoC is energy management to keep the cabin climate-control system running even while the engine is optimised, ensuring thermal comfort and operator well-being. The project is still in execution, with data consolidation under way to validate the potential for scaling across the entire mine fleet.
Removal of aggregated material
This project aims to minimise the volume of material aggregated in truck beds by evaluating the effectiveness of DumpPro equipment in the fleet. The initiative focuses on mitigating so-called dead load, a phenomenon caused by the clayey nature of bauxite, which sticks to the bottom of the beds and reduces useful transport capacity. The DumpPro PoC uses controlled vibration to automatically release adhered material. The project is still in execution to monitor the balance between vibration effectiveness and the structural integrity of the fleet.