Energy Matrix Transition

The Transmission Line Project (PLT) connects MRN to the National Interconnected System, replacing fuel oil-fired thermal generation from Porto Trombetas with clean energy from the Brazilian matrix.

Project Overview

A cleaner energy matrix for the future.

The Transition of MRN's Energy Matrix is ​​led by the Transmission Line Project (PLT). Historically supplied by fuel oil thermoelectric plants, the Porto Trombetas operation will be connected to the National Interconnected System (SIN), starting to use clean sources from the Brazilian matrix.

It is the company's main decarbonization and energy transition initiative: a 230 kV and 98 km line, from Oriximiná to the future Saracá substation, scheduled for completion in early 2027 and reducing CO₂ emissions from electrical generation by up to 90%.

−90%
Generation emissions (Scope 1)
2027
Expected completion of the PLT
Starting point
Fuel oil thermoelectric plants
Infrastructure
230 kV line 98 km
Primary source
Sistema Interligado Nacional (SIN)
Destino
Clean matrix · completion 2027
Objectives

What the transition seeks to achieve

Goals that guide each stage of the project, from diagnosis to consolidation of the new matrix.

Decarbonization

Replace Porto Trombetas' fuel oil-fired thermal generation with clean energy from the National Interconnected System (SIN), reducing CO₂ emissions from electrical generation by up to 90% (Scope 1).

Clean energy from SIN

Connect the operation and Vila de Porto Trombetas to the Brazilian matrix, mostly made up of clean sources, through the Transmission Line Project (PLT).

Reliability and efficiency

Gain stability and security of supply with connection to the national grid, reducing dependence on river fuel transport.

Legacy for the Amazon

Leave a cleaner and more resilient energy infrastructure for the region, MRN's main decarbonization and energy transition initiative.

How it works

From thermoelectric plants to the clean national grid

The transition replaces fuel oil-fired thermal generation with clean energy from the National Interconnected System.

Starting point

Current sources

Generation by fuel oil thermoelectric plants
Supply of the operation and the town of Porto Trombetas
Direct CO₂ emissions (Scope 1) in energy generation
High dependence on fossil fuel transported by river
Destination

Clean energy (SIN)

Connection to the National Interconnected System (SIN)
230 kV transmission line, 98 km long
From the Oriximiná substation to the future Saracá substation (Porto Trombetas)
Clean sources that make up the majority of the Brazilian matrix
Timeline

The transition phases

A progressive schedule, from the Installation License to connection with the National Interconnected System.

2024

Approval and Installation License (LI)

Investment approved by shareholders and Installation License (LI) issued, with project implementation started.

Ongoing

Construction of the 230 kV line

Implementation of 98 km of transmission line, from the Oriximiná substation to the MRN site, in Porto Trombetas.

Ongoing

Saracá Substation

Construction of the Saracá substation, within the MRN site, which will receive energy from the National Interconnected System.

Early 2027

Connection to SIN

Expected completion of the work and connection to the national grid, replacing fuel oil thermal generation.

Continuidade

Consolidated decarbonization

Reduction of up to 90% in emissions from electrical generation and around 25% of the company's total emissions.

Benefits

Decarbonization and clean energy

Reducing emissions and clean energy are at the heart of the project's gains.

Emissions reduction

Up to 90% reduction in CO₂ emissions from electrical generation (Scope 1) and around 25% of the company's total emissions.

Clean energy from SIN

Replacement of thermal generation with clean sources that make up the majority of the Brazilian matrix.

Cleaner air

Lower emission of local pollutants, improving air quality in Porto Trombetas and the surrounding area.

Confiabilidade

Connection to the national grid increases the security and stability of the energy supply.

Less fossil logistics

Reduction of dependence on river transport of fuel oil to supply the operation.

Environmental legacy

Avoids up to 2.1 million tons of CO₂e in 15 years — a long-term legacy for the Amazon.

Project Indicators

The transition numbers

The impacts of the Transmission Line Project (PLT) on the decarbonization of MRN's operations.

−90%
Reduction of CO₂ emissions from electrical generation (Scope 1)
≈ 25%
Estimated reduction in the company's total emissions
2.1 Mt
Tons of CO₂e avoided in 15 years
2027
Expected completion of the transmission line

Composition of the energy matrix

Estimated share of each source (%) — comparison between the current and projected matrix.

Current matrix
Fuel oil thermoelectric plant 100%
Clean grid (SIN) 0%
Projected matrix (PLT)
Fuel oil thermoelectric plant 10%
Clean grid (SIN) 90%
Fuel oil thermoelectric plant
Clean grid (SIN)
Frequently Asked Questions

Questions about the transition

What is the MRN Energy Matrix Transition?

It is the Transmission Line Project (PLT), which connects MRN to the National Interconnected System (SIN) and replaces the current internal generation — made by fuel oil thermoelectric plants that supply the operation and the Village of Porto Trombetas — with the clean sources that make up the majority of the Brazilian matrix. It is the company's main decarbonization and energy transition initiative.

How does the transmission line work?

The PLT is a 230 kV line 98 km long, which runs from the Oriximiná substation to the future Saracá substation, located within the MRN site, in Porto Trombetas. Completion of the work is scheduled for the beginning of 2027.

What is the impact on reducing emissions?

The project reduces CO₂ emissions from electricity generation (Scope 1) by up to 90% and represents around a 25% reduction in the company's total emissions. In total, it will avoid up to 2.1 million tons of CO₂e over 15 years.

What stage is the project at?

The Installation License (LI) has already been issued and implementation began in 2024, the year in which the investment was also approved by shareholders. Connection to the National Interconnected System is scheduled for the beginning of 2027.

How does the project benefit the Amazon?

In addition to reducing emissions, the project replaces fossil generation with clean energy from the national grid, contributes to local air quality and leaves a cleaner and more resilient energy infrastructure for the region — a legacy that remains beyond the mining operation.

Video

Learn more about the Energy Transition

This content is loaded from YouTube and uses third-party cookies.

Learn more about the Energy Transition

Clean energy as a legacy for the Amazon

Discover in detail MRN's projects, commitments and results in the transition to a cleaner and more efficient energy matrix.

Find out more about MRN Environmental commitments